Warning: Use of undefined constant ENVIRONMENT - assumed 'ENVIRONMENT' (this will throw an Error in a future version of PHP) in /homepages/31/d300592667/htdocs/equib/wp-cms/wp-config.php on line 32
London Overground Rail Operations Limited – Stations Upgrade Programme – Equib

Equib were retained to assist LOROL on both small capital projects, such as station enhancements, and in the management of their risk exposure during the implementation of the East London Line project.

Project:

Following securing the franchise, London Overground Rail Operations Ltd (LOROL) established their own projects division who are responsible for undertaking refurbishment and enhancement projects on the stations along the London Overground rail routes.

Services:

Equib were retained to assist LOROL on both small capital projects, such as station enhancements, and in the management of their risk exposure during the implementation of the East London Line project.